Inspection History Details
Inspection Status: Not Ready
Inspection History: RSBU - Building Final
Permit Number - T21CM07886
Inspection Description - RSBU - Building Final
Inspection Status - Not Ready
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/27/2022 | RSBU - Building Final | Not Ready | ||
04/24/2023 | RSBU - Building Final | Not Ready | Not ready. Smoke detectors need to be installed in bedroom and hallway. Water heater door needs to be installed. Door to enter the home needs to be 1 hr rated along with self latching. Mini splits needs to be installed prior to final inspection. Outdoor lighting north of addition needs to be installed. ABS clean out needs to be cut to grade and capped. 4/24/2023 | |
09/29/2023 | RSBU - Building Final | Passed |