Inspection Status: Not Ready
Inspection History: COT - LCBU - Excavation/Rebar/Zoning
| Date |
Description |
Inspector |
Results |
Comments |
| 10/26/2022 |
COT - LCBU - Excavation/Rebar/Zoning |
|
Not Ready |
|
| 03/24/2025 |
COT - LCBU - Excavation/Rebar/Zoning |
|
Partial Pass |
3/24/25: pre-construction meeting. |
| 11/04/2025 |
COT - LCBU - Excavation/Rebar/Zoning |
|
Not Ready |
11/4/2025 not ready. All plumbing needs to be wrapped. Add reinforcements at F3/C1 Detail 110 not per schedule. Hooks come down at 12". Plans call for them to be at 16". Corrections need to be made or provide a letter from engineer stating that the install is approved and submit to the city for approval. |
| 11/10/2025 |
COT - LCBU - Excavation/Rebar/Zoning |
|
Partial Pass |
11/10/2025 partial pass. Corrections have been made. Okay for concrete placement in footings along with pad. Pending exterior stairway footings. |