Inspection Status: Not Ready
Inspection History: RSME - Mechanical Progress
| Date |
Description |
Inspector |
Results |
Comments |
| 10/27/2022 |
RSME - Mechanical Progress
|
|
Not Ready |
|
| 06/22/2023 |
RSME - Mechanical Progress
|
|
Re-inspection required |
6/22/23: all penetrations to top plate must be sealed, all hvac boxes must be blocked on 3 sides, mechanical flex must be attached to air supply. Exhaust fans missing in bathroom and laundry room. Nail plates missing for plumbing in bathroom and kitchen, over notched studs need stud-shoe. Outside lathe must be done before intermediate inspection. |
| 06/30/2023 |
RSME - Mechanical Progress
|
|
Re-inspection required |
Corrections not completed. |
| 07/25/2023 |
RSME - Mechanical Progress
|
|
Canceled |
7/25/23: cancel per Cesar. |