Inspection History Details
Inspection Status: Not Ready
Inspection History: COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/26/2022 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Not Ready | ||
| 06/22/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Re-inspection required | 6/22/23: all penetrations to top plate must be sealed, all hvac boxes must be blocked on 3 sides, mechanical flex must be attached to air supply. Exhaust fans missing in bathroom and laundry room. Nail plates missing for plumbing in bathroom and kitchen, over notched studs need stud-shoe. Outside lathe must be done before intermediate inspection. | |
| 07/21/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 6/22/23: all penetrations to top plate must be sealed, all hvac boxes must be blocked on 3 sides, mechanical flex must be attached to air supply. Exhaust fans missing in bathroom and laundry room. Nail plates missing for plumbing in bathroom and kitchen, over notched studs need stud-shoe. Outside lathe must be done before intermediate inspection. 7/21/23: corrections made |