Inspection Status: Not Ready
Inspection History: COT - LCBU - Excavation/Rebar/Zoning
| Date |
Description |
Inspector |
Results |
Comments |
| 10/26/2022 |
COT - LCBU - Excavation/Rebar/Zoning |
|
Not Ready |
|
| 12/21/2021 |
COT - LCBU - Excavation/Rebar/Zoning |
DQUINN |
Not ready for Inspection |
Entered by NGARCIA3 - nr
Per Jose |
| 12/08/2021 |
COT - LCBU - Excavation/Rebar/Zoning |
DQUINN |
Partial Approval |
Entered by VVERA1 - pa
5 canopy column footings, including north side monument, ok to pour. |
| 12/02/2021 |
COT - LCBU - Excavation/Rebar/Zoning |
TGAUSP |
Cancelled |
Entered by RSALDAT1 - Cancelled
Unable to reach Jose 480-271-2948 for inspection |
| 11/19/2021 |
COT - LCBU - Excavation/Rebar/Zoning |
DQUINN |
Partial Approval |
Entered by VVERA1 - pa |
| 11/18/2021 |
COT - LCBU - Excavation/Rebar/Zoning |
DQUINN |
Cancelled |
Entered by RSALDAT1 - Called Jose 6x between 8:30 and 2:45. Went straight to voice mail, which was full.
Called Tucson Core Construction Co. 5x between 1 and 3. Left a message at 1 and got the message machine there after. I have not received a response. I called Core, looking for an alternative contact # for the site.
Please recall for the inspection and be sure to leave a message for the inspector, with active contact #s. |
| 11/15/2021 |
COT - LCBU - Excavation/Rebar/Zoning |
DQUINN |
Partial Approval |
Entered by VVERA1 - Pa
West 1/2 of building exterior and interior wall footings ok to pour.
7 - F1 interior post footings ok to pour. |
| 10/27/2022 |
COT - LCBU - Excavation/Rebar/Zoning |
|
Passed |
|