Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Approved
Inspection History: TDOT-EXCAV GENERAL INSPECTION
| Date |
Description |
Inspector |
Results |
Comments |
| 09/30/2020 |
TDOT-EXCAV GENERAL INSPECTION |
|
Approved |
Completed. Forms removed. Site cleaned up. Barricades removed. Closed. |
| 09/25/2020 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
Sidewalk panel removed and replaced. Forms and barricades need removal. |
| 09/11/2020 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
Sidewalk panel at new meter box needs to be replaced. Contacted Tucson Water again. |
| 09/01/2020 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
New meter box set and service line installed. Cold patch in roadway. Sidewalk panel damaged. Total panel needs to be replaced. |
| 08/27/2020 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
New meter box set and service line installed. Cold patch in roadway. Sidewalk panel damaged. |