Inspection Status: Approved
Inspection History: INSP - INITIAL CODE ENFORCMENT
| Date |
Description |
Inspector |
Results |
Comments |
| 05/28/2020 |
INSP - INITIAL CODE ENFORCMENT |
|
Approved |
Communication called that T.F.D. on site witha gutter fire. While getting ready the call was cancelled. Communication called back to respond to the fire due to was having an electrical issue with the fire. Arrived and the units were still on site and picking up. The fire investigator was on site checking for cause and found where a nail was near some wiring that was channeled in the wood framing. The stud was charred and the wiring was also burned in the area of the nail. The rain gutter was also charged and has some burning inside the wall framing at the roof area. The metal cap was removed due to removing the wood siding and the roofing material was pulled off to check for fire on the plywood. A vent hole was cut to check for fire in the rafter spacing. The fire was in the southwest bedroom on the door to the exterior. The wires were cut and taped up to have the electrical turned back on. The breakers were turned back on to both unit. The fire was contained to the rear wall in the southwest bedroom. Having trouble with the breaker to the rear unit on the main breaker for unit B. The breaker is hard to turn off and back on when required. Did let the owner know that an electrician will need to check the breaker and may need to be replaced. The owner signed the paperwork and will secure the area. Southwest Gas was leaving the gas on but has an issue with the dryer vent lacking a cap with louvers for the flex and was outside the house near the porch. RV. |