Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Passed
Inspection History: BULD - Electrical Clearance
| Date |
Description |
Inspector |
Results |
Comments |
| 05/12/2025 |
BULD - Electrical Clearance |
|
Passed |
5-12-25, electrical panel okay to be energized. Bonding at gas lines still required and to be verified prior to final. Contractor is missing mud ring for ufer access but provided me with pictures showing ufer, acorn clamp and # copper wire. Apparently, access to ufer will not be possible so I explained 2 grounding rods with #4 copper may be required at the main panel to satisfy code for building final. ECO clearance issued to TEP. |