Inspection Status: Canceled
Inspection History: RSBU - Building Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/04/2022 | RSBU - Building Final | Canceled | Inspection Canceled | |
| 09/24/2025 | RSBU - Building Final | Re-inspection required | 9-24-25: paint all exterior plastic, missing hose bib northside , seal exterior penetration at north side where HVAC line set exits wall, install cap to cover exposed electrical wiring above condenser, add elbow to water heater condenser line, add R3 insulation to hot line side of water heaters, plumb lavatory in bathroom in bedroom 3 and install plumbing fixtures, connect bathroom fan, seal all water closets, missing address identification on home, landing required at doors, install vanity/fixtures, and ptrap in powder room, missing hammer arrestor on dishwasher supply line, stucco all pending areas, provide UL listing on exterior receptacle covers; otherwise install weather resistant type covers such as bubble cover types, hand railing at stairs not complete, the spacing between the balusters or guard must be such that a 4-inch diameter ball cannot pass through, update east side subpanel schedule in garage. NOTE: submit a framing plan for garage ledger framing, |
|
| 09/26/2025 | RSBU - Building Final | Passed | 9-26-25: Building final approved. |