Inspection History Details
Inspection Status: Canceled
Inspection History: COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/04/2022 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Canceled | Inspection Canceled | |
| 01/29/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Not Applicable | duplicate | |
| 01/29/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Re-inspection required | 1/29/25 1. SW7 not per plan; blocking is missing, anchor bolts are missing, nail spacing not not per plan. 2. A35s missing per detail 4 on 4.2 3. ICF is covering headers on main floor couldn't verify H1 headers. 4. Detail 6 on 4.2 calls for H2.5 not H3. 5. Stopped inspections, more items may be called out in next inspection. |
|
| 02/03/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Not Ready | ||
| 02/07/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Re-inspection required | 2/7/25 missing GFIC at master bathroom, fire foam missing in penetrations between floors, make sure grounding is made up at the sub panel and boxes, blocking on 3 sides for all mechanical, straps on DWV at second floor. DWVnot under test. Staples at electrical receptacles. Re inspection required. |
|
| 02/11/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 2/11/25 pass | |
| 04/11/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
| 09/27/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Partial Pass | 9/27/24: plumbing underground/ DWV for second floor per plans ok to proceed. |