Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit: T20CM08450

Parcel: 11624056B


Addresses:

103 S PANORAMA CI

Inspection Status: Canceled

Inspection History: COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.

Date Description Inspector Results Comments
11/04/2022 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Canceled Inspection Canceled
01/29/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Not Applicable duplicate
01/29/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Re-inspection required 1/29/25

1. SW7 not per plan; blocking is missing, anchor bolts are missing, nail spacing not not per plan.

2. A35s missing per detail 4 on 4.2

3. ICF is covering headers on main floor couldn't verify H1 headers.

4. Detail 6 on 4.2 calls for H2.5 not H3.

5. Stopped inspections, more items may be called out in next inspection.
02/03/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Not Ready
02/07/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Re-inspection required 2/7/25 missing GFIC at master bathroom, fire foam missing in penetrations between floors, make sure grounding is made up at the sub panel and boxes, blocking on 3 sides for all mechanical, straps on DWV at second floor. DWVnot under test. Staples at electrical receptacles.

Re inspection required.
02/11/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 2/11/25 pass
04/11/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
09/27/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Partial Pass 9/27/24: plumbing underground/ DWV for second floor per plans ok to proceed.