Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
| Date |
Description |
Inspector |
Results |
Comments |
| 03/18/2021 |
ENGINEERING - FINAL |
|
Approved |
|
| 02/26/2021 |
ENGINEERING - FINAL |
|
Not ready for Inspection |
NOT READY PAVING PARKING LOT IN PROGRESS |
| 02/26/2021 |
ENGINEERING - FINAL |
|
Partial Approval |
PARTIAL AT THIS TIME, OK FOR A TCO PENDING ALL OTHER INSPECTIONS AS NEEDED. FINAL NOT TO BE GIVEN TILL ALL THE WORK ON THIS SITE IS COMPLETED AND ALL SPECTIONS HAVE BEEN APPROVED. THE PAVEMENT IN THE PARKING LOT FOR THIS SITE WAS REMOVED AND REPLACED LIKE FOR LIKE. IT APPEARS THAT NONE OF THE GRADES HAVE BEEN CHANGED, AND ALL THE ORIGINAL PARKING IS LOCATED AS IT WAS IN THE AERIAL PHOTO FOR 2015. THE ADA PARKING SPACES AND ACCESS AISLE HAVE BEEN GRADE FOR GRADE AND FOUND TO BE COMPLIANT AT LESS THAN 2% IN ALL DIRECTIONS. I SPOKE WITH STEVE SHIELDS WHO PERFORMED THE ORIGINAL REVIEW FOR THE SITE DURING THE REVIEW OF THE BUILDING PERMIT AND HE ADVISED ME THAT A SITE PLAN WAS NOT REQUIRED AT THE TIME OF THE REVIEW. I HAVE ADVISED STEVE SHIELDS AND THE CONTRACTOR G & J DEVELOPMENT THAT THE PATHWAYS FROM THE BUILDING NORTH TO FORT LOWELL AND EAST TO CHAPEL AVE ARE COMPLIANT FOR THE CROSS SLOPES BUT ARE NON COMPLIANT FOR THE RUNNING SLOPE, THIS VARIES FROM 5.5% - 7.5% AT VARIOUS LOCATIONS. THESE NON COMPLIANT SLOPES WILL NEED TO BE ADDRESSED BY THE OWNER OR DEVELOPER IN THE FUTURE SINCE THEY HAVE NIT BEEN APPROVED BY THIS DEPARTMENT NOW OR IN THE FUTURE. |
| 02/25/2021 |
ENGINEERING - FINAL |
|
Not ready for Inspection |
Not ready. Contractor preparing parking lot for new asphalt. |