Permit: T20CM04050

Parcel: 140420120


Addresses:

7073 S PLUMER AV

Inspection Status: Approved

Inspection History: ELECTRIC - UFER

Date Description Inspector Results Comments
08/26/2021 ELECTRIC - UFER Approved Approved
06/02/2021 ELECTRIC - UFER Partial Approval
06/02/2021 ELECTRIC - UFER Partial Approval partial, conduit laterals from duct bank F ok to shade to form bulk head.
05/26/2021 ELECTRIC - UFER Partial Approval INSPECTION PLACED IN AP BY INSPECTOR RELEFANTE ON 05/26/21. INSPECTION PLACED IN PA BY INSPECTOR DMUNIZ ON 06/02/21.
05/12/2021 ELECTRIC - UFER Partial Approval Partial, Uffer attachment and ground ring with rods installed for Generator.
03/31/2021 ELECTRIC - UFER Partial Approval Partial, EGC installed through Duct bank B from PDC to Generator location ok for concrete placement.
03/17/2021 ELECTRIC - UFER Partial Approval Partial, Grounding Conductor installed through duct bank and underground conduits from manhole to tunnel.
03/16/2021 ELECTRIC - UFER Partial Approval Partial, Inspection of Ground Rods and EGC for tank 2, 3 & duct banks L,N,P. Ground Installed in footing for PDC.
03/04/2021 ELECTRIC - UFER Partial Approval Partial, EGC installed with duct banks and terminated @ vaults.