Inspection Status: Approved
Inspection History: ELECTRIC - UFER
| Date |
Description |
Inspector |
Results |
Comments |
| 08/26/2021 |
ELECTRIC - UFER |
|
Approved |
Approved |
| 06/02/2021 |
ELECTRIC - UFER |
|
Partial Approval |
|
| 06/02/2021 |
ELECTRIC - UFER |
|
Partial Approval |
partial, conduit laterals from duct bank F ok to shade to form bulk head. |
| 05/26/2021 |
ELECTRIC - UFER |
|
Partial Approval |
INSPECTION PLACED IN AP BY INSPECTOR RELEFANTE ON 05/26/21. INSPECTION PLACED IN PA BY INSPECTOR DMUNIZ ON 06/02/21. |
| 05/12/2021 |
ELECTRIC - UFER |
|
Partial Approval |
Partial, Uffer attachment and ground ring with rods installed for Generator. |
| 03/31/2021 |
ELECTRIC - UFER |
|
Partial Approval |
Partial, EGC installed through Duct bank B from PDC to Generator location ok for concrete placement. |
| 03/17/2021 |
ELECTRIC - UFER |
|
Partial Approval |
Partial, Grounding Conductor installed through duct bank and underground conduits from manhole to tunnel. |
| 03/16/2021 |
ELECTRIC - UFER |
|
Partial Approval |
Partial, Inspection of Ground Rods and EGC for tank 2, 3 & duct banks L,N,P. Ground Installed in footing for PDC. |
| 03/04/2021 |
ELECTRIC - UFER |
|
Partial Approval |
Partial, EGC installed with duct banks and terminated @ vaults. |