Inspection Status: Not Ready
Inspection History: COT - HCBU - Framing
Permit Number - T20CM02722
Inspection Description - COT - HCBU - Framing
Inspection Status - Not Ready
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/26/2022 | COT - HCBU - Framing | Not Ready | ||
10/14/2022 | COT - HCBU - Framing | WGALLAGHER | Partial Approval | Entered by NGARCIA3 - Partial approval for forth floor above bottom cord of trusses, ok to insulate |
10/13/2022 | COT - HCBU - Framing | WGALLAGHER | Partial Approval | Entered by NGARCIA3 - Partial approval several boca plates missing, several plate penetrations not fire sealed |
09/30/2022 | COT - HCBU - Framing | WGALLAGHER | Partial Approval | Entered by VVERA1 - Partial approval for mechanical room ok to insulate and rock 3 walls not the south wall |
09/19/2022 | COT - HCBU - Framing | WGALLAGHER | Partial Approval | Entered by NGARCIA3 - Partial approval for 4th floor shear walls only |
09/08/2022 | COT - HCBU - Framing | WGALLAGHER | Partial Approval | Entered by NGARCIA3 - Partial approval for soffit areas on all 4 floors guest rooms AND FOR NORTH AND SOUTH DUCT SHAFT OK TO INSTALL DUCTWORK IN DUCT SHAFTS. |
08/25/2022 | COT - HCBU - Framing | WGALLAGHER | Partial Approval | Entered by NGARCIA3 - Partial approval in central elevator shaft north wall ok to drywall first layer |
07/19/2022 | COT - HCBU - Framing | DMUNIZ | Partial Approval | Entered by NGARCIA3 - PARTIAL, South East building pop out ok to sheath, 1st floor corridor ok to start ceiling Sheetrock. |
06/29/2022 | COT - HCBU - Framing | DMUNIZ | Partial Approval | Entered by VVERA1 - Partial, Through bolt system for 2nd & 3rd floor Interior shear walls, corrections complete and ok to proceed. |
06/23/2022 | COT - HCBU - Framing | DMUNIZ | Partial Approval | Entered by NGARCIA3 - PARTIAL, INSPECTION FOR 2ND,3RD, & 4th FLOOR THROUGH BOLTS AND NAILING FOR INTERIOR SHEAR WALLS OK PROCEED WITH TOP OFF SHEETROCK. (NOTE: INSTALL MISSING WASHERS AND NUTS WHERE NEEDED, AND TIGHTEN ALL BOLTS. |
06/14/2022 | COT - HCBU - Framing | DMUNIZ | Partial Approval | Entered by NGARCIA3 - PARTIAL, header attachments for 4th floor ok to proceed with sheathing. |
02/13/2023 | COT - HCBU - Framing | Partial Pass | for fourth floor smoke damper north wing north closet, ok to install hard lid | |
02/24/2023 | COT - HCBU - Framing | Partial Pass | third floor corridor drywall nailing ok to tape and first floor guest rooms b wing only | |
03/03/2023 | COT - HCBU - Framing | Partial Pass | partial approval for back of house ok to insulate exterior walls only | |
03/06/2023 | COT - HCBU - Framing | Partial Pass | partial approval for 4,3,2 fire damper sealing in elevator shafts, ok to proceed | |
03/08/2023 | COT - HCBU - Framing | Partial Pass | Soffits in hallways are properly framed, electrical boxes and wiring is complete. Okay to apply gyp board to framing. | |
03/09/2023 | COT - HCBU - Framing | Partial Pass | partial approval for north mail room soffits, ok to drywall | |
03/14/2023 | COT - HCBU - Framing | Partial Pass | partial approval for soffit areas at both elevators and duct shafts 2nd layer, ok to tape | |
03/19/2023 | COT - HCBU - Framing | Partial Pass | for back of house | |
03/22/2023 | COT - HCBU - Framing | Not Ready | ||
03/28/2023 | COT - HCBU - Framing | Partial Pass | first floor corridor A wing soffits ok to tape | |
04/05/2023 | COT - HCBU - Framing | Partial Pass | for entry area | |
10/25/2022 | COT - HCBU - Framing | Partial Pass | ||
11/08/2022 | COT - HCBU - Framing | Partial Pass | partial approval for forth floor B wing rooms ok to dry wall excluding corridor | |
11/16/2022 | COT - HCBU - Framing | Partial Pass | partial approval for rooms A401 TO A413 DRYWALL NAILING IN GUEST ROOMS OK TO TAPE | |
11/17/2022 | COT - HCBU - Framing | Partial Pass | partial approval for forth floor corridor ok to drywall | |
11/23/2022 | COT - HCBU - Framing | Partial Pass | partial approval for third floor guest rooms |