Inspection Status: Not Ready
Inspection History: COT - HCBU - Framing
| Date |
Description |
Inspector |
Results |
Comments |
| 10/26/2022 |
COT - HCBU - Framing |
|
Not Ready |
|
| 10/14/2022 |
COT - HCBU - Framing |
WGALLAGHER |
Partial Approval |
Entered by NGARCIA3 - Partial approval for forth floor above bottom cord of trusses, ok to insulate |
| 10/13/2022 |
COT - HCBU - Framing |
WGALLAGHER |
Partial Approval |
Entered by NGARCIA3 - Partial approval several boca plates missing, several plate penetrations not fire sealed |
| 09/30/2022 |
COT - HCBU - Framing |
WGALLAGHER |
Partial Approval |
Entered by VVERA1 - Partial approval for mechanical room ok to insulate and rock 3 walls not the south wall |
| 09/19/2022 |
COT - HCBU - Framing |
WGALLAGHER |
Partial Approval |
Entered by NGARCIA3 - Partial approval for 4th floor shear walls only |
| 09/08/2022 |
COT - HCBU - Framing |
WGALLAGHER |
Partial Approval |
Entered by NGARCIA3 - Partial approval for soffit areas on all 4 floors guest rooms AND FOR NORTH AND SOUTH DUCT SHAFT OK TO INSTALL DUCTWORK IN DUCT SHAFTS.
|
| 08/25/2022 |
COT - HCBU - Framing |
WGALLAGHER |
Partial Approval |
Entered by NGARCIA3 - Partial approval in central elevator shaft north wall ok to drywall first layer |
| 07/19/2022 |
COT - HCBU - Framing |
DMUNIZ |
Partial Approval |
Entered by NGARCIA3 - PARTIAL, South East building pop out ok to sheath, 1st floor corridor ok to start ceiling Sheetrock.
|
| 06/29/2022 |
COT - HCBU - Framing |
DMUNIZ |
Partial Approval |
Entered by VVERA1 - Partial, Through bolt system for 2nd & 3rd floor Interior shear walls, corrections complete and ok to proceed.
|
| 06/23/2022 |
COT - HCBU - Framing |
DMUNIZ |
Partial Approval |
Entered by NGARCIA3 - PARTIAL, INSPECTION FOR 2ND,3RD, & 4th FLOOR THROUGH BOLTS AND NAILING FOR INTERIOR SHEAR WALLS OK PROCEED WITH TOP OFF SHEETROCK. (NOTE: INSTALL MISSING WASHERS AND NUTS WHERE NEEDED, AND TIGHTEN ALL BOLTS. |
| 06/14/2022 |
COT - HCBU - Framing |
DMUNIZ |
Partial Approval |
Entered by NGARCIA3 - PARTIAL, header attachments for 4th floor ok to proceed with sheathing. |
| 02/13/2023 |
COT - HCBU - Framing |
|
Partial Pass |
for fourth floor smoke damper north wing north closet, ok to install hard lid |
| 02/24/2023 |
COT - HCBU - Framing |
|
Partial Pass |
third floor corridor drywall nailing ok to tape and first floor guest rooms b wing only |
| 03/03/2023 |
COT - HCBU - Framing |
|
Partial Pass |
partial approval for back of house ok to insulate exterior walls only |
| 03/06/2023 |
COT - HCBU - Framing |
|
Partial Pass |
partial approval for 4,3,2 fire damper sealing in elevator shafts, ok to proceed |
| 03/08/2023 |
COT - HCBU - Framing |
|
Partial Pass |
Soffits in hallways are properly framed, electrical boxes and wiring is complete. Okay to apply gyp board to framing. |
| 03/09/2023 |
COT - HCBU - Framing |
|
Partial Pass |
partial approval for north mail room soffits, ok to drywall |
| 03/14/2023 |
COT - HCBU - Framing |
|
Partial Pass |
partial approval for soffit areas at both elevators and duct shafts 2nd layer, ok to tape |
| 03/19/2023 |
COT - HCBU - Framing |
|
Partial Pass |
for back of house |
| 03/22/2023 |
COT - HCBU - Framing |
|
Not Ready |
|
| 03/28/2023 |
COT - HCBU - Framing |
|
Partial Pass |
first floor corridor A wing soffits ok to tape |
| 04/05/2023 |
COT - HCBU - Framing |
|
Partial Pass |
for entry area |
| 10/25/2022 |
COT - HCBU - Framing |
|
Partial Pass |
|
| 11/08/2022 |
COT - HCBU - Framing |
|
Partial Pass |
partial approval for forth floor B wing rooms ok to dry wall excluding corridor |
| 11/16/2022 |
COT - HCBU - Framing |
|
Partial Pass |
partial approval for rooms A401 TO A413 DRYWALL NAILING IN GUEST ROOMS OK TO TAPE |
| 11/17/2022 |
COT - HCBU - Framing |
|
Partial Pass |
partial approval for forth floor corridor ok to drywall |
| 11/23/2022 |
COT - HCBU - Framing |
|
Partial Pass |
partial approval for third floor guest rooms |