Inspection History Details
Inspection Status: Approved
Inspection History: STEM WALL/RETAINING WALL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/16/2021 | STEM WALL/RETAINING WALL | Approved | Approved | |
| 11/16/2020 | STEM WALL/RETAINING WALL | Partial Approval | Partial, Stems for East stairwell ok for concrete placement. | |
| 11/13/2020 | STEM WALL/RETAINING WALL | Partial Approval | Partial. Stem walls at elevator shaft and stairwell. Ok to place concrete in progress areas. | |
| 10/30/2020 | STEM WALL/RETAINING WALL | Partial Approval | pa All s.w. Stems and footings ok to pour. |
|
| 09/01/2020 | STEM WALL/RETAINING WALL | Partial Approval | Partial, East Stairwell Stem walls ok for concrete placement. | |
| 08/20/2020 | STEM WALL/RETAINING WALL | Partial Approval | Partial, Elevator shaft stem wall ok for concrete placement. | |
| 08/12/2020 | STEM WALL/RETAINING WALL | Partial Approval | Partial. North side stairwell at parking garage, and stem wall on N. Side Center section. | |
| 08/05/2020 | STEM WALL/RETAINING WALL | Partial Approval | partial 1- Elevator floor mat and vertical steel reinforcement is okay for concrete. 1- Footing steel reinforcement is okay for concrete for the West wall, and half of the North wall and South wall up to entryway only. |