Inspection History Details
Inspection Status: Approved
Inspection History: TDOT-EXCAV GENERAL INSPECTION
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/08/2019 | TDOT-EXCAV GENERAL INSPECTION | Approved | roadway was milled on 5/7 at a depth of 2 inches area was repaved due to moritorium on 5/8/19 . Area is approved and job is complete |
|
| 03/20/2019 | TDOT-EXCAV GENERAL INSPECTION | Continued | Sewer line was repaired, Tree roots from park were invading the pipe. Temp repairs to roadway were made. The santa Cruz nieghborhood was just repaved. Informed KE and G that the roadway needed to be repaired 50 ft either side of the excavtion. Area was marked by me for asphalt removals |