Inspection History Details
Permit: T19RW00657
Inspection Status: Approved
Inspection History: TDOT-EXCAV GENERAL INSPECTION
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/19/2019 | TDOT-EXCAV GENERAL INSPECTION | Approved | Paul Rosenboom performend finally walk through. No issues or repairs needed. | |
| 04/01/2019 | TDOT-EXCAV GENERAL INSPECTION | Continued | Traffic control time has been changed on permit to allow for more time to work in the roadway. DG being installed, DG is stored on NE corner of Drexel and Tucson Blvd. Job is coming to a end |
|
| 03/12/2019 | TDOT-EXCAV GENERAL INSPECTION | Continued | Main line irrigation work continuing in medians. No issues | |
| 03/05/2019 | TDOT-EXCAV GENERAL INSPECTION | Continued | work continuing in medians heading North from Bilby to Drexel. Contractor got a revised permit to set traffic control up earlier. No issues | |
| 02/25/2019 | TDOT-EXCAV GENERAL INSPECTION | Continued | Main line installed in first median North of Valencia, Backfilling will take pplace this week. Traffic control set up per plan, but slowing is very apparent through the area. Traffic issues will ease up when contractor is in second median and Valencia can be opened up. | |
| 02/21/2019 | TDOT-EXCAV GENERAL INSPECTION | Continued | work continuing in medians for landscape work, in contact with Tucson irrigation crews. |