Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: FIRE SPKLR - OH PIPING & HYDRO
Permit Number - T19FC00280
Inspection Description - FIRE SPKLR - OH PIPING & HYDRO
Inspection Status - Approved
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/15/2020 | FIRE SPKLR - OH PIPING & HYDRO | Approved | ||
| 04/22/2020 | FIRE SPKLR - OH PIPING & HYDRO | Partial Approval | Still need to complete level one in some areas to check for leaks but hydro not really required | |
| 03/25/2020 | FIRE SPKLR - OH PIPING & HYDRO | Partial Approval | Trash Chute fire sprinkler hydro - Approved - Inspection performed via FaceTime due to COVID19 | |
| 12/13/2019 | FIRE SPKLR - OH PIPING & HYDRO | Partial Approval | Stanpipe & Riser P1 & P3 207 PSI & 222 PSI | |
| 11/08/2019 | FIRE SPKLR - OH PIPING & HYDRO | Partial Approval | 6th floor 207 PSI. Some heads are plugged with the incorrect head and need to be reverified once the new ones are in place | |
| 09/18/2019 | FIRE SPKLR - OH PIPING & HYDRO | Partial Approval | 4th and 5th floor 215 PSI approved | |
| 07/18/2019 | FIRE SPKLR - OH PIPING & HYDRO | Partial Approval | Inspection 2 Standpipe, 3rd and 1st floor minus the retail areas on the first floor. Sprinklers shall be added to the bottom of each stairwell. 3 heads noted on the fourth floor shall be removed due to no door being installed. |
|
| 06/26/2019 | FIRE SPKLR - OH PIPING & HYDRO | Partial Approval | 2nd floor @ 201 PSI Building to be phased for hydro. Added 7 inspections to cover the hydros. Fees need to be paid prior to calling in an inspection. |