Inspection Status: Approved
Inspection History: FIRE SPKLR - UG PIPING FLUSH
| Date |
Description |
Inspector |
Results |
Comments |
| 12/06/2019 |
FIRE SPKLR - UG PIPING FLUSH |
|
Approved |
Final OV Hydro of the Penthouse. 6th floor heads that were incorrect were corrected. 211 PSI @ test |
| 06/04/2019 |
FIRE SPKLR - UG PIPING FLUSH |
|
Partial Approval |
Flushed the 5' line from street to main connection |