Inspection History Details
Inspection Status: Approved
Inspection History: FIRE - ALARM FINAL
Permit Number - T19FC00224
Inspection Description - FIRE - ALARM FINAL
Inspection Status - Approved
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/02/2020 | FIRE - ALARM FINAL | Approved | ||
| 05/19/2020 | FIRE - ALARM FINAL | Partial Approval | tested the north side of the 1st floor and the TI spaces. Tested the duct smokes and some of them did not shut down the unit properly. Fire alarm program has been changed and they need to update the minotoring to match the new program. Need to re-test the ADA rooms since they are not wired to the building correctly. BDA signals also need to be reverified. | |
| 05/12/2020 | FIRE - ALARM FINAL | Partial Approval | Tested the corridor smokes and the sounders level 6-4 complete. NAC panels need to have required lock out and tags. Duct smoke detectors need to be connected to the fire alarm system in corridors for proper shut down. Elevator testing was completed by the Elevator inspetor today. | |
| 04/25/2019 | FIRE - ALARM FINAL | Cancelled | WILL NEED TO FIELD VERIFY THE PARKING GARAGE SYNCHRONIZATION MONITORING REQUIRES A PERMIT MONITORING REQUIRES TWO MEANS OF TRANSMISSION |