Inspection Status: Approved
Inspection History: INSP - FOLLOW UP CODE ENFORCE
| Date |
Description |
Inspector |
Results |
Comments |
| 10/16/2019 |
INSP - FOLLOW UP CODE ENFORCE |
|
Approved |
PERMIT WAS RESUBMITTED BY CONTRACTOR BRIAN EVANS AND APPROVED BY DAN SANTA CRUZ. CONTRACTOR IS CALLING FOR 3-4 PEDISTAL AT ONE TIME FOR INSPECTION. MET WITH CONTRACTOR AND INSPECTOR DAN QUIN ON THE FIRST INSPECTION. DAN QUINN WAS HAPPY WITH WHAT HE FOUND AND HAD NO ISSUES. C/E HAS NO FURTHER ISSUES AS PERMIT HAS BEEN SECURED. COMPLIANCE / CLOSE CASE. |
| 08/02/2019 |
INSP - FOLLOW UP CODE ENFORCE |
|
Approved |
INSPECTORS ROMERO AND GOODMAN MET WITH PLANS EXAMINERS DAN SANTA CRUZ AND JUAN GARCIA, AND CONTRACTOR BRIAN EVANS WAS INCLUDED. MR EVANS WAS VERY UP FRONT ABOUT THE TYPE OF WORK THAT WAS BEING DONE INSIDE THE PARK, ADDED PEDISTALS, AND J BOXES AND MAYBE HAVING TO DO SOME UNDERGROUND REPAIRS. PICTURES WERE PROVIDED BY BRIAN EVANS. DAN SANTA CRUZ INFORMED BRIAN THAT PERMITS WERE CLEARLY REQUIRED NOT ONLY FOR THE WORK ALREADY DONE BUT IF ALL WORK WAS TO BE INCLUDED UNDER A BLANKET PERIT THAT ALL PLSSIBLE FUTURE WORK WOULD NEED TO BE IDENTIFIED. BRIAN EVANS PROVIDED A MAP OF THE PARK WITH LOT SPACES AND A SCHEMATIC OF WHAT WOULD REQUIRE PEDISTAL, JBOXES AND POSSIBLE OTHER REPAIRS. DAN SANTA CRUZ ALSO INFORMED BRIAN THAT PLANS FOR THE APPROVED PEDESTAL WOULD REQUIRE AN ENGINEERED STAMP. MARTIN ROMERO INFORMED DAN THAT A NOV WOULD BE PREPARED FOR PERMITS REQUIRED. |