ELECTRICAL WOP THROUGHOUT THE TRAILER PARK
Case Violations
Case Number: T19DV06250
Case Status: COMPLIAN
Case Description: WORK WITHOUT PERMITS-COMMERCL
Total Violations: 1
| Violation Date | Code Statue |
|---|---|
| 08/05/2019 | T.C. Ch. 16, Sec. 16-4. PERMITS REQUIRED. Unless otherwise exempt pursuant to section 301 of the Administrative Code, as adopted by reference per section 6-1 of this Code, or pursuant to any other ordinance or statute, no building, structure or building service equipment regulated by this chapter or by the technical codes adopted by the city shall be built, erected, constructed, enlarged, altered, repaired, moved, improved, removed, converted or demolished unless a permit first has been obtained from the building official in the manner provided in the administrative and building codes adopted by the city. The purpose of a permit is to ensure that all construction is inspected by qualified City of Tucson personnel as directed by ordinance to verify compliance with city codes. Failure to obtain proper permit with inspections and approvals shall deem the construction to be unsafe. |
Completed Inspections
Case Status: COMPLIAN
Case Number: T19DV06250
Case Description: WORK WITHOUT PERMITS-COMMERCL
Total Completed Inspections - 2
| End Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/31/2019 | INSP - INITIAL CODE ENFORCMENT | GOODMAN | Approved | COMPLAINTANT HAS CONTACTED MARTIN ROMERO AND IDENTIFIED SEVERAL ELECTRICAL PEDISTALS THAT HAVE BEEN IDENTIFIED INSIDE THE MOBILE HOME PARK. MARTIN AND I LOCATED 3 OF THE PEDISTALS THAT HAVE CLEARLY REPLACED OLDER PEDISTALS WITH LAABELING ON THE PEDISTALS THAT INCLUDE LOT NUMBERS/ ADDRESSES FOR EACH UNIT. WHILE WALKING THE PARK WE RAN INTO THE ELECTRICAL CANTRACTOR BRIAN EVANS WHO PROVIDED INFOMATION OF HOW THE COMPLAINT STARTED AND WORK THAT WAS BEING COMPLETED THRU OUT THE PARK TO INCLUDE INSTALLATION OF NEW PEDISTALS, J BOXES AND POSSIBLE UNDERGROUND WORK. MARTIN ASKED IF WE ALL COULD MEET WITH DAN SANTA CRUZ ELECTRICAL PLANS EXAMINER FOR THE CITY. MARTIN SET THE MEETING FOR ALL TO ATTEND |
| 10/16/2019 | INSP - FOLLOW UP CODE ENFORCE | GOODMAN | Approved | PERMIT WAS RESUBMITTED BY CONTRACTOR BRIAN EVANS AND APPROVED BY DAN SANTA CRUZ. CONTRACTOR IS CALLING FOR 3-4 PEDISTAL AT ONE TIME FOR INSPECTION. MET WITH CONTRACTOR AND INSPECTOR DAN QUIN ON THE FIRST INSPECTION. DAN QUINN WAS HAPPY WITH WHAT HE FOUND AND HAD NO ISSUES. C/E HAS NO FURTHER ISSUES AS PERMIT HAS BEEN SECURED. COMPLIANCE / CLOSE CASE. |
Completed Activity Special Conditions
Case Description - WORK WITHOUT PERMITS-COMMERCL
Case Number - T19DV06250
Case Status: COMPLIAN
Total Completed Case Activity Conditions: 3
| Date | Name |
| 10/08/2019 | RETURNED MAIL |
| 08/08/2019 | CONTACTED BY MAILING |
| 08/06/2019 | NOTICE OF VIOLATION ISSUED |