Inspection History Details
Inspection Status: Approved
Inspection History: INSP - INITIAL CODE ENFORCMENT
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/31/2019 | INSP - INITIAL CODE ENFORCMENT | Approved | BUILDING DEMOLITION TAKING PLACE ON A PROPERTY DIRECTLY SOUTH. DURING DEMO THE CMU WALL BUCKLED OUTWARD TOWARDS THE RESIDENTIAL UNIT COLLAPSING THE PERIMETER WALL AND IMPACTING THE ROOF AND CMU WALL OF THE RESIDENTIAL STRUCTURE. PORTION OF THE ROOF SHEATHING IS DAMAGED AS WELL AS THE FACIA DISLODGED, ALLTHOUGH DAMAGE TO THE ROOF IS NOT SEVERE. THE IMPACT ON THE RESIDENTIAL STRUCTURE WALL CAUSED A HOLE APPROX. 3'X4' NEAR THE SOUTH WEST CORNER OF THE WALL AND CAUSING CRACKING AND HEAVY SEPERATION THROUGHOUT THE SOUTHWEST PORTION OF THE STRUCTURE. . IMPACT WITH THE RESIDENTIAL STRUCTURE WAS ALONG APPROX HALF OF THE SOUTHERN WALL. THE MATERIAL REMAINS UP AGAINST THE RESIDENTIAL STRUCTURE. STUCCO DAMAGE ON THE EXTERIOR FINISH. ONE ELECTRICAL CIRCUIT AFFECTED. CIRCUIT WAS ISOLATED AND SECURED. IT SHALL REMAIN OFF UNTIL REPAIRS CAN BE MADE. A STRUCTUAL ENGINEER SHALL EVALUATE THE DAMAGE AND STRUCTUAL INTEGRITY OF THE WALL FOR THE PURPOSE OF SECUREMENT AND REPAIR, UNDER PERMIT CONCORD GENERAL CONTRACTOR ON SITE HAS SECURED THE DEMO AREA UNTIL THE ENGINEER CAN EVALUATE. CONTRACTOR WORKING WITH THE TENANT AND OWNER FOR ACCESS FOR SECUREMENT AND REPAIRS |