Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - CONSTRUCTION POWER
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/19/2021 | ELECTRIC - CONSTRUCTION POWER | Approved | ||
| 03/05/2021 | ELECTRIC - CONSTRUCTION POWER | Not ready for Inspection | NOT READY Need 2nd bracket, address, landed or taped wire ends, temp gfi. |