Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/30/2020 | ENGINEERING - FINAL | Approved | APPROVED | |
| 12/23/2020 | ENGINEERING - FINAL | Not ready for Inspection | Not ready. Adam with Haworth construction at602-332-5019. Complete all work associated with the development package permit and schedule inspections for that permit |
|
| 12/11/2020 | ENGINEERING - FINAL | Not ready for Inspection | Not ready. Unscheduled inspection. Contractor has not been scheduling inspections from the development package permit as required. Accessible parking requires correction |