Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - ROUGH, SOIL
Permit Number - T19CM08781
Inspection Description - PLUMBING - ROUGH, SOIL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
06/16/2020 | PLUMBING - ROUGH, SOIL | Approved | approved 1- DWV water test provided, this inspection is for the bldg drain for all units up to P.O.C to bldg. sewer except Units A & C. |
|
05/26/2020 | PLUMBING - ROUGH, SOIL | Partial Approval | Partial. Units A&B in the North west corner. | |
05/19/2020 | PLUMBING - ROUGH, SOIL | Partial Approval | partial 1- Underground rough plumbing is okay for the upper two units only. |
|
05/18/2020 | PLUMBING - ROUGH, SOIL | Denied | denied 1- Shall provide a 10 foot water test on the Sanitary system. |
|
05/18/2020 | PLUMBING - ROUGH, SOIL | Partial Approval | 1- This inspection is for the underground waste lines for the First Floor (4) units stubbed out of unit only. | |
05/15/2020 | PLUMBING - ROUGH, SOIL | Not ready for Inspection | NR 1- Contractor cancelled the inspection request for today. |