Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date |
Description |
Inspector |
Results |
Comments |
| 10/10/2019 |
PLUMBING - FINAL |
|
Approved |
SWG clearance is required. |
| 10/09/2019 |
PLUMBING - FINAL |
|
Not ready for Inspection |
Flue pipe on roof not properly installed, needs to be 3 feet above cooler inlet, provide pan under water heater, sediment Traps at water heater and furnace not properly installed. |
| 10/07/2019 |
PLUMBING - FINAL |
|
Denied |
Gas line below grade covered prior to inspection, roof jack required at all roof penetrations, gas pipe on roof to be blocked up minimum 3 inches, flue pipe at water heater not properly attached, flue pipe to be a minimum 3 feet above cooler inlet , provide access to interior |