Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
| Date |
Description |
Inspector |
Results |
Comments |
| 08/26/2020 |
ENGINEERING - FINAL |
|
Approved |
Approved |
| 07/22/2020 |
ENGINEERING - FINAL |
|
Partial Approval |
OK FOR A TCO, FENCE ALL AREAS UNDER CONSTRUCTION AT THIS TIME IF STUDENTS ARE ALLOWED ON THIS SITE, OR COMPLETE ALL OF THE REMAINING LANDSCAPE ON THE SOUTH AND WEST SIDES OF THIS SITE. |
| 07/13/2020 |
ENGINEERING - FINAL |
|
Not ready for Inspection |
Not ready. Walk site with GC went over work to complete for final all notes will be on development package. |
| 07/09/2020 |
ENGINEERING - FINAL |
|
Not ready for Inspection |
Not ready. Complete all sidewalks on site pedestrian path ways from building to building. |
| 06/15/2020 |
ENGINEERING - FINAL |
|
Not ready for Inspection |
Not ready. Met with Roy on site the GC he had a conversation with Dave Roberts about some temporary gates that would stay in place after the job is complete to bring in turf. And then add permanent panels. |