Inspection Status: Approved
Inspection History: FRAMING
| Date |
Description |
Inspector |
Results |
Comments |
| 06/09/2020 |
FRAMING |
|
Approved |
|
| 03/17/2020 |
FRAMING |
|
Partial Approval |
first floor shear walls per plan only |
| 03/13/2020 |
FRAMING |
|
Partial Approval |
This inspection is for interior shear walls first floor only, complete nailing at top edge of sheer walls all else OK. |
| 03/10/2020 |
FRAMING |
|
Partial Approval |
Upper level sheer walls interior OK one side. |
| 03/06/2020 |
FRAMING |
|
Not ready for Inspection |
Work not complete enough to inspect. |
| 02/27/2020 |
FRAMING |
|
Partial Approval |
Cafeteria area OK. |
| 02/25/2020 |
FRAMING |
|
Partial Approval |
1st floor Classroom only, no cafeteria area. |
| 02/10/2020 |
FRAMING |
|
Not ready for Inspection |
Jobsite closed. |
| 02/07/2020 |
FRAMING |
|
Partial Approval |
1st floor 2 Interior shear walls on East end Anchored @ sill plates & ok to sheath both sides. 2nd floor Exterior Framing ok to sheath, note install more Screws @ sill plates, & secure assembly @ CMU per plan. |
| 02/03/2020 |
FRAMING |
|
Not ready for Inspection |
Previous corrections still not made. |
| 01/31/2020 |
FRAMING |
|
Not ready for Inspection |
Work not complete |