Inspection Status: Approved
Inspection History: STEM WALL/RETAINING WALL
| Date |
Description |
Inspector |
Results |
Comments |
| 06/09/2020 |
STEM WALL/RETAINING WALL |
|
Approved |
|
| 02/19/2020 |
STEM WALL/RETAINING WALL |
|
Partial Approval |
stair wells front and back ok for grout |
| 12/20/2019 |
STEM WALL/RETAINING WALL |
|
Partial Approval |
All top out OK, still need rake at stairwells. |
| 12/18/2019 |
STEM WALL/RETAINING WALL |
|
Partial Approval |
7th lift for North and East CMU walls ok for grout. Columns on North west CMU wall ok for 5th lift. |
| 12/17/2019 |
STEM WALL/RETAINING WALL |
|
Not ready for Inspection |
Canceled by contractor. |
| 12/16/2019 |
STEM WALL/RETAINING WALL |
|
Partial Approval |
Sixth lift at elevator shaft OK. Sixth lift at north and east walls OK. Third lift at East columns OK. Fifth lift at north columns OK |
| 12/13/2019 |
STEM WALL/RETAINING WALL |
|
Not ready for Inspection |
Canceled my contractor |
| 12/11/2019 |
STEM WALL/RETAINING WALL |
|
Partial Approval |
Continuation of third lift. |
| 12/09/2019 |
STEM WALL/RETAINING WALL |
|
Partial Approval |
Grid Line C1- CMU from CA-CD 4th lift ok, stairwell 3rd lift ok. Also Grid Line CI- CMU from C1-C4 4th lift ok, stairwell 3rd lift ok. |
| 12/06/2019 |
STEM WALL/RETAINING WALL |
|
Partial Approval |
Third lift OK except stairwells. |
| 12/04/2019 |
STEM WALL/RETAINING WALL |
|
Partial Approval |
Second lift OK except east stairwell. |
| 12/02/2019 |
STEM WALL/RETAINING WALL |
|
Partial Approval |
First lift of cmu ok |
| 11/14/2019 |
STEM WALL/RETAINING WALL |
|
Partial Approval |
ok at bldg perimeter |
| 11/12/2019 |
STEM WALL/RETAINING WALL |
|
Partial Approval |
Stemwall at building OK Pending engineer approval of missing bar at jambs |