Inspection History Details
Inspection Status: Denied
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/10/2020 | PLUMBING - FINAL | Denied | 1- Shall provide a water hammer arrestor for the dishwasher water supply line. 2- Shall secure the Dishwasher drain hose to bottom of countertop with a approved strap. 3- Shall provide a hose bib vacuum breaker at rear HB. 4- Shall provide a sediment trap for the water heater gas supply. 5- Shall provide (3) sheet metal screws per joint on the water heater vent connector. 6- Shall provide a 1 inch annular space around the water heater double flu vent. |
|
| 03/06/2020 | PLUMBING - FINAL | Not ready for Inspection | need to add elbow down on TPR valve on water heater |