Permit: T19CM06028

Parcel: 11504475B


Addresses:

1055 N PARK AV

Inspection Status: Approved

Inspection History: PLUMBING - ROUGH, SOIL

Date Description Inspector Results Comments
08/17/2021 PLUMBING - ROUGH, SOIL Approved Approved
06/17/2020 PLUMBING - ROUGH, SOIL Partial Approval Partial. The area within columns BB.9 to BF and gridlines B3 to B6.
06/16/2020 PLUMBING - ROUGH, SOIL Partial Approval Partial. From BD.5-B3 diagonally to BF-B4
06/11/2020 PLUMBING - ROUGH, SOIL Partial Approval partial. Underground plumbing within the area of BA to BC and B2 to B5.
06/05/2020 PLUMBING - ROUGH, SOIL Partial Approval Partial. All underground plumbing from A9 to A-16 and AF to AM.
06/04/2020 PLUMBING - ROUGH, SOIL Partial Approval Partial. 4 inch line on column AL-gridlines A3 thru A-12.
05/29/2020 PLUMBING - ROUGH, SOIL Partial Approval Partial. Building A. 4 inch main on grid line A2.5-AC.9 to AL; go south on gridline AL to A5.
05/26/2020 PLUMBING - ROUGH, SOIL Partial Approval Partial. Building A. 4 inch plumbing lines and two ejector pumps from columns AA thru AE and gridlines above A1 to A14.