Inspection Status: Approved
Inspection History: PLUMBING - ROUGH, SOIL
| Date |
Description |
Inspector |
Results |
Comments |
| 08/17/2021 |
PLUMBING - ROUGH, SOIL |
|
Approved |
Approved |
| 06/17/2020 |
PLUMBING - ROUGH, SOIL |
|
Partial Approval |
Partial. The area within columns BB.9 to BF and gridlines B3 to B6. |
| 06/16/2020 |
PLUMBING - ROUGH, SOIL |
|
Partial Approval |
Partial. From BD.5-B3 diagonally to BF-B4 |
| 06/11/2020 |
PLUMBING - ROUGH, SOIL |
|
Partial Approval |
partial. Underground plumbing within the area of BA to BC and B2 to B5. |
| 06/05/2020 |
PLUMBING - ROUGH, SOIL |
|
Partial Approval |
Partial. All underground plumbing from A9 to A-16 and AF to AM. |
| 06/04/2020 |
PLUMBING - ROUGH, SOIL |
|
Partial Approval |
Partial. 4 inch line on column AL-gridlines A3 thru A-12. |
| 05/29/2020 |
PLUMBING - ROUGH, SOIL |
|
Partial Approval |
Partial. Building A. 4 inch main on grid line A2.5-AC.9 to AL; go south on gridline AL to A5. |
| 05/26/2020 |
PLUMBING - ROUGH, SOIL |
|
Partial Approval |
Partial. Building A. 4 inch plumbing lines and two ejector pumps from columns AA thru AE and gridlines above A1 to A14. |