Permit: T19CM05838

Parcel: 11705033A


Addresses:

340 E 6TH ST


Inspection Status: Approved

Inspection History: EXCAVATION/LAYOUT REBAR & ZON

Permit Number - T19CM05838

Inspection Description - EXCAVATION/LAYOUT REBAR & ZON

Inspection Status - Approved

Date Description Inspector Results Comments
07/21/2021 EXCAVATION/LAYOUT REBAR & ZON Approved AP
01/07/2020 EXCAVATION/LAYOUT REBAR & ZON Partial Approval 4" pvc rough from D to B.2 and 3.2 to 4.1 ok to backfill.
01/03/2020 EXCAVATION/LAYOUT REBAR & ZON Partial Approval GL 5.2 to 3
A to B
E and W
stairwells of E building ok to 5’ 4”. Ok to grout.
W and N walls 1 to 6.5
And from D to F on gl 1 ok to shoot
01/02/2020 EXCAVATION/LAYOUT REBAR & ZON Not ready for Inspection
12/31/2019 EXCAVATION/LAYOUT REBAR & ZON Partial Approval GL A - B and 5 to 2.8
F-2 footings ok to pour with mud check in footings on thurs morning.
12/18/2019 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Slab at gl 6.1 to 6.5 and C.3 to D.3 ok to pour.
Gl 5.1 to 6.4 and C.1 to C.4 ok to pour.

Footing gl 5 A to B ok to pour.
12/12/2019 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Stairs 1,2 slabs.
12/03/2019 EXCAVATION/LAYOUT REBAR & ZON Cancelled Called in wrong address.
11/19/2019 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Columns and footings at GL: B.9-F.2/1.8-4.8. Ok to place concrete in progress areas.
11/14/2019 EXCAVATION/LAYOUT REBAR & ZON Not ready for Inspection Contractor cancelled, will reschedule for 15 November.
11/07/2019 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Pre-slab and May foundation for over head crane as per SSK1.2; 17 October 2019.
11/05/2019 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Concrete shear walls at GL: B.5/6.1. 0k to place concrete in progress areas.
11/04/2019 EXCAVATION/LAYOUT REBAR & ZON Partial Approval CC1 concrete columns; at GL: A.2-D.2/5.4-7.9: 13 columns. Ok to place concrete in progress areas.
10/29/2019 EXCAVATION/LAYOUT REBAR & ZON Partial Approval 5.2 to 8 and a to d4. Elevator pad and columns.
All footings in this grid line section ok to pour.
10/09/2019 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Shotcrete from pier 89, grid line 1J, to Pier 78, 1C. west side of west building.
10/02/2019 EXCAVATION/LAYOUT REBAR & ZON Partial Approval 13 columns from 89-76. Drilling holes, speedy will witness epoxy of rebar to attach ww to for grout placement.
09/30/2019 EXCAVATION/LAYOUT REBAR & ZON Partial Approval (RVI) CAISONS 69 AND 55 THROUGH 60, 40 THROUGH 45 OK TO POUR
09/27/2019 EXCAVATION/LAYOUT REBAR & ZON Partial Approval (RVI) CAISONS 61 THROUGH 68 AND 70 THROUGH 77 OK TO POUR
09/26/2019 EXCAVATION/LAYOUT REBAR & ZON Partial Approval CAISONS 78 THROUGH 89 OK TO POUR
09/25/2019 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Pier cages, 75 to 89 ok to drop.
09/24/2019 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Inspect Caissons number 75 to 89.