Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/08/2020 | ENGINEERING - FINAL | Approved | IS APPROVED | |
| 07/06/2020 | ENGINEERING - FINAL | Partial Approval | IS A PARTIAL AT THIS TIME, IT WILL BE RESCHEDULED ON 7/8/2020. THE PREVIOUS ITEMS WERE CHECKED TODAY SIDEWALKS FORMS, ADA PARKING AND ACCESS AISLE, AND WATER HARVESTING LOCATED IN THE NORTHEAST CORNER OF THIS SITE. ALL OF THE ABOVE ITEMS HAVE BEEN COMPLETED AND APPROVED. THE SIDEWALK PLACEMENT AND DECOMPOSED GRANITE WILL BE DONE TOMORROW AND THE FINAL INSPECTION WILL BE SCHEDULED. |