Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
Permit Number - T19CM04691
Inspection Description - ENGINEERING - FINAL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
05/26/2020 | ENGINEERING - FINAL | Approved | ||
05/22/2020 | ENGINEERING - FINAL | Partial Approval | Partially approved. All work associated with building number five Marshalls, shown on the development package plan has been completed. Permit partially approved only because it is part of a larger development package. Per Dave Roberts’s instruction | |
05/19/2020 | ENGINEERING - FINAL | Not ready for Inspection | Partially approved. Complete the work shown on the development package plan in the rear of the building. Remove the scaffolding around the columns at the store entrance, complete the roofing above the entranceway and remove all temporary fencing for final approval. | |
04/10/2020 | ENGINEERING - FINAL | Partial Approval | Ok for TCO for stocking and fixtures. | |
04/10/2020 | ENGINEERING - FINAL | Partial Approval | Engineering has no issues that would prevent a temporary certificate of occupancy for stocking and training, with approval from other required inspectors. | |
04/08/2020 | ENGINEERING - FINAL | Not ready for Inspection | Complete the work at the front entryway. Call for required inspections from your development package permit. Thanks. | |
04/07/2020 | ENGINEERING - FINAL | Not ready for Inspection | Provide safe access and egress for employees. Schedule inspection for both combination permit and development package permits provide approval from fire and other inspectors forTCO |