Inspection Status: Approved
Inspection History: FRAMING
| Date |
Description |
Inspector |
Results |
Comments |
| 06/01/2020 |
FRAMING |
|
Approved |
|
| 05/18/2020 |
FRAMING |
|
Partial Approval |
Partial, Framing for plumbing walls on demising fire assembly ok to Insulate and Sheetrock these locations all units. |
| 04/10/2020 |
FRAMING |
|
Partial Approval |
Decking and crickets |
| 03/16/2020 |
FRAMING |
|
Partial Approval |
Shear walls third floor Only |
| 02/21/2020 |
FRAMING |
|
Partial Approval |
Inspection of 3rd floor Deck Approved. |
| 02/12/2020 |
FRAMING |
|
Partial Approval |
Interior Clips and straps for 1st floor to 2nd floor connections inspected & Approved. |
| 01/13/2020 |
FRAMING |
|
Partial Approval |
Floor decking for 2nd floor ok. |
| 01/10/2020 |
FRAMING |
|
Partial Approval |
first floor |