Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/14/2019 | PLUMBING - FINAL | Approved | ||
| 11/04/2019 | PLUMBING - FINAL | Partial Approval | REVIEW OF WATER DISINFECTION REPORT COMPLETED | |
| 10/30/2019 | PLUMBING - FINAL | Denied | 1- Shall terminate the Water Heater T & P drain to the Mop Sink. 2- Shall provide a grate for the Floor Sink. 3- Shall caulk the mop sink. 4- Shall provide test and certification for the backflow preventer. 5- Shall provide water chlorination report. |
|
| 06/07/2019 | PLUMBING - FINAL | Prior to Final Inspectn | WATER DISINFECTION REPORT REQUIRED |