Inspection Status: Approved
Inspection History: REINFORCED MASONRY PRE-GROUT
| Date |
Description |
Inspector |
Results |
Comments |
| 09/03/2019 |
REINFORCED MASONRY PRE-GROUT |
|
Approved |
|
| 08/28/2019 |
REINFORCED MASONRY PRE-GROUT |
|
Partial Approval |
complete installing verticals then third lift OK to grout. |
| 08/26/2019 |
REINFORCED MASONRY PRE-GROUT |
|
Partial Approval |
West and south cmu walls of break room addition form 4’ to 8’ above finish floor |
| 08/23/2019 |
REINFORCED MASONRY PRE-GROUT |
|
Partial Approval |
West and south cmu walls of break room addition for 0’ to 4’ above finish floor, grouting was done in am before city inspection but special inspection was performed by 3rd party before grout placement |
| 08/16/2019 |
REINFORCED MASONRY PRE-GROUT |
|
Partial Approval |
first lift on west wall OK to grout |