Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - INTERMEDIATE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/10/2020 | PLUMBING - INTERMEDIATE | Approved | ||
| 12/31/2019 | PLUMBING - INTERMEDIATE | Partial Approval | Missing nail plates in changing area, copper pipe touching aluminum stud in restroom. | |
| 12/20/2019 | PLUMBING - INTERMEDIATE | Denied | 1- Approved plans call for a 3 inch VTR at restrooms 2- Shall provide protection on the overhead cold water line from the truss gusset plates. 3- Closet flanges not installed at this time. |