Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Approved
Inspection History: ELECTRIC - FINAL
| Date |
Description |
Inspector |
Results |
Comments |
| 05/06/2019 |
ELECTRIC - FINAL |
|
Approved |
|
| 05/02/2019 |
ELECTRIC - FINAL |
|
Not ready for Inspection |
Go to COT and upgrade permit to a Service Panel Upgrade, this is a new panel and not a Reconnect. Contact TEP for a panel spot or approve the panel location you have chosen. This is a new 200 amp Panel and requires the following: 2 8’ ground rods a min of 6’ apart. A #4 GEC water and gas bond. 2 brackets to support the service mast above the panel at the wall. 2/0 copper or 4/0 aluminum service entrance cables. IRC 3603.1. Remove paint from gas pipe for a pure bond to that pipe with the gas bond clamp #12 ga wire for 20 amp and #14 for 15 amp circuits. Label all breaker functions in the panel. Drive ground rods flush or below grade so rods are in contact with earth for 8 feet. |