Inspection History Details
Inspection Status: Not Applicable
Inspection History: ELECTRIC - RECONNECT
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/02/2019 | ELECTRIC - RECONNECT | Not Applicable | NEEDS TO SCHEDULE 2065, 2070 IS NOT NEEDED. SEE INSPECTOR NOTES BELOW-CB Go to COT and upgrade permit to a Service Panel Upgrade, this is a new panel and not a Reconnect. Contact TEP for a panel spot or approve the panel location you have chosen. This is a new 200 amp Panel and requires the following: 2 8’ ground rods a min of 6’ apart. A #4 GEC water and gas bond. 2 brackets to support the service mast above the panel at the wall. 2/0 copper or 4/0 aluminum service entrance cables. IRC 3603.1. Remove paint from gas pipe for a pure bond to that pipe with the gas bond clamp #12 ga wire for 20 amp and #14 for 15 amp circuits. Label all breaker functions in the panel. Drive ground rods flush or below grade so rods are in contact with earth for 8 feet. |
|
| 04/19/2019 | ELECTRIC - RECONNECT | Denied | Install 2nd ground rod. Install new properly sized wires from panel to meter base. Have TEP rep come out for direction on new drop. Note: owner just bought house and it appears that the new panel was put up without permits |