Inspection History Details
Inspection Status: Partial Approval
Inspection History: EXCAVATION/LAYOUT REBAR & ZON
Permit Number - T19CM02277
Inspection Description - EXCAVATION/LAYOUT REBAR & ZON
Inspection Status - Partial Approval
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
04/09/2020 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | 9 light poles on West side. | |
01/23/2020 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Column footings for North ten columns at basketball court. | |
08/23/2019 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Balance of N2 yard. Site walls remain to be inspected. | |
07/11/2019 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Phase 3 bulkhead at each side 14B Continuous btwn BA and A Continuous btwn B and CA Continuous D line to C past Grid line 14E Continuous E of grid 14E and btwn Grid A and AA |
|
07/10/2019 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Footers along column line D east to column line 14B and column line 14B from A thru D ok. | |
07/09/2019 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Isolated footings for phase 3 2 F4’s Grid line A 4 F4’s Grid line 14 D N&S 2 F8 Grid line A |
|
07/08/2019 | EXCAVATION/LAYOUT REBAR & ZON | Cancelled | Per phone call from office. | |
07/03/2019 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | Will call next week | |
07/01/2019 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | Unable to access for inspection. | |
06/28/2019 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | F3, 5 isolated footings/pads Corner continuous fry and F4 pad FTC at line A1 |
|
06/26/2019 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Spread footer at column line C/7 and perimeter footer along column line D to 12. | |
06/24/2019 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | 8 Pads plus continuous footing at GL D2-9. 2Spread footings GL 5 B-C |
|
06/19/2019 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Grid line A, 2 to 3, rebar, bolts and steel base plates. | |
06/18/2019 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | 5 Pad Footings, rebar, bolts. At Grid line A-7A, A-8A, C9, C-9B, and C-10 |
|
06/17/2019 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | BF1 east side footing ok to pour | |
06/14/2019 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | OK call online D from column line 1 to 2 | |
06/13/2019 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | West end footing at Grid line 1 from A1 through C9. 6 Footing/Pads Grid line 4 to Grid line 2, Grid Line B and C |
|
06/10/2019 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Sub footing/pad per plan for BF2 | |
06/06/2019 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Grid line 1A and BB. Footing BF3. | |
05/30/2019 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Sump pit at elevator shaft OK. |