Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

PRO is currently experiencing an outage. Some documents and records may not be available on PRO momentarily. We apologize for the inconvenience and are working to restore full access.

Permit: T19CM01996

Parcel: 12310001H


Addresses:

1625 N CAMPBELL AV

Inspection Status: Passed

Inspection History: COT - HCPL - Plumbing Above Ceiling

Date Description Inspector Results Comments
01/23/2020 COT - HCPL - Plumbing Above Ceiling JBURGE Approved Entered by DMERANZ1 - Phase 0
01/07/2020 COT - HCPL - Plumbing Above Ceiling JBURGE Partial Approval Entered by DMERANZ1 - Phase 2; Public area and public restrooms
11/13/2019 COT - HCPL - Plumbing Above Ceiling JBURGE Partial Approval Entered by DMERANZ1 - Administration area, Phase 3; Rooms: 561, 562; 564; 565; 730; 731; 732; 733; 735.
11/01/2019 COT - HCPL - Plumbing Above Ceiling JBURGE Not ready for Inspection Entered by DMERANZ1 - Contractor cancelled.
10/30/2019 COT - HCPL - Plumbing Above Ceiling JBURGE Partial Approval Entered by DMERANZ1 - Domestic Heated Hot Water lines (supply and return) at Level #2 to Level #6; tested at 110 psi. Ok to insulate progress areas.
10/25/2019 COT - HCPL - Plumbing Above Ceiling JCLAXTON Partial Approval Entered by DMERANZ1 - Several holes in rated walls, remove temp wires.
09/03/2019 COT - HCPL - Plumbing Above Ceiling JBURGE Partial Approval Entered by DMERANZ1 - Administration area, Phase III. OK to insulate domestic water lines.
08/29/2019 COT - HCPL - Plumbing Above Ceiling JBURGE Partial Approval Entered by DMERANZ1 - Administration area domestic hot and cold water lines. Ok to insulate progress areas in Phase II.
08/07/2019 COT - HCPL - Plumbing Above Ceiling JBURGE Partial Approval Entered by DMERANZ1 - Observation staff break room. Ok to set tiles.
07/16/2019 COT - HCPL - Plumbing Above Ceiling JBURGE Partial Approval Entered by DMERANZ1 - Waste and vent lines 2" - 4".
07/16/2019 COT - HCPL - Plumbing Above Ceiling JBURGE Partial Approval Entered by DMERANZ1 - Waste and vent lines 2" - 4".