Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit: T19CM01870

Parcel: 134250080


Addresses:

1110 S MANN AV

Inspection Status: Passed

Inspection History: COT - RSBU - Excavation/Rebar/Zoning 

Date Description Inspector Results Comments
07/26/2019 COT - RSBU - Excavation/Rebar/Zoning  DQUINN Approved Entered by VFLORES1 -
07/23/2019 COT - RSBU - Excavation/Rebar/Zoning  GWEST Correction Required Entered by DMERANZ1 - Building drainage piping can be sleeved and run perpendicular through a footing but cannot run parallel in the footing. No dimensions (width/depth) on footing detail or call out for reinforcing steel/rebar (Top /bottom or none) size and placement. Rebar being used to be 3" from any dirt at bottom and sides. Rebar shall have clearance between ABS drain piping and the rebar for aggregate and cement during the pour.