Inspection Status: Passed
Inspection History: COT - RSBU - Preslab
| Date |
Description |
Inspector |
Results |
Comments |
| 07/26/2019 |
COT - RSBU - Preslab |
DQUINN |
Approved |
Entered by VFLORES1 - |
| 07/23/2019 |
COT - RSBU - Preslab |
GWEST |
Correction Required |
Entered by DMERANZ1 - Building drainage piping can be sleeved and run perpendicular through a footing but cannot run parallel in the footing.
No dimensions (width/depth) on footing detail or call out for reinforcing steel/rebar (Top
/bottom or none) size and placement.
Rebar being used to be 3" from any dirt at bottom and sides.
Rebar shall have clearance between ABS drain piping and the rebar for aggregate and cement during the pour.
|