Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - RECONNECT
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/07/2019 | ELECTRIC - RECONNECT | Approved | Verbal Clearance sent to TEP @ 12:45PM for (RECN). 1000 AMP 120/208V Existing SES ok to re-energize. |
|
| 09/06/2019 | ELECTRIC - RECONNECT | Partial Approval | This inspection was to determine if the power kill scheduled for tomorrow can move ahead as scheduled. Conclusion: if insulating rubber is installed as discussed and a protective cover is placed over the conductors, the power kill and reconnect can move forward as scheduled. |