Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - ROUGH, SOIL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/24/2019 | PLUMBING - ROUGH, SOIL | Approved | ||
| 05/20/2019 | PLUMBING - ROUGH, SOIL | Denied | 1- Shall provide a minimum 2 times the pipe diameter for the trap arm distance at tub waste. Reference section 909.3 2018 IPC 2- Re test system. |
|
| 05/17/2019 | PLUMBING - ROUGH, SOIL | Denied | 1- Shall locate the outlet of the vent to the tub above the centerline of the drain. Reference section 905.3 2018 IPC 2- Retest the system. |