Inspection History Details
Inspection Status: Denied
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/06/2019 | PLUMBING - FINAL | Denied | 1- Shall provide (3) sheet metal screws per joint on the water heater flu vent and draft collar and remove the mechanical tape around the dbl wall flu vent. 2- Shall provide a gas bond on the system. 3- Shall extend and terminate the wall heaterflu vent (3) feet above the cooler. 4- Shall extend and terminate the water heater T & P drain to daylight. 5- Shall secure the gas line drop to the wall furnace. |
|
| 02/06/2019 | PLUMBING - FINAL | Approved | All corrections have been made. Clear gas meter Verbal clearance called in at 2:53pm |