Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/02/2020 | PLUMBING - FINAL | Approved | REVIEW OF WATER CHLORONATION REPORT COMPLETED | |
| 12/27/2019 | PLUMBING - FINAL | Partial Approval | All above partialled inspections to be approved with completion of certs and permit closed. | |
| 12/24/2019 | PLUMBING - FINAL | Cancelled | Canceled due to rain. | |
| 12/20/2019 | PLUMBING - FINAL | Denied | 1- Shall provide a water heater drip pan drain and terminate it to the mop sink. 2- Shall provide Trap Guards on all Floor Drains. 3- Shall caulk the Drinking Fountains. 4- South water closet shall be located 16 to 18 inches sidewall clearance. 5- Shall provide an approved wrap for the Lavatories traps and supplies. 6- Shall install the grab bars and paper dispenser per ANSI A117.1 standards. 7- Shall secure the water heater expansion tank. 8, Shall raise the Mop Sink clean out for accessibility. 9- Shall provide water chlorination report |
|
| 12/19/2019 | PLUMBING - FINAL | Not ready for Inspection | 1- Work is incomplete | |
| 12/17/2019 | PLUMBING - FINAL | Not ready for Inspection | not complete. | |
| 05/02/2019 | PLUMBING - FINAL | Prior to Final Inspectn | WATER DISINFECTION REPORT REQUIRED |