Inspection Status: Approved
Inspection History: TDOT-EXCAV GENERAL INSPECTION
| Date |
Description |
Inspector |
Results |
Comments |
| 12/03/2018 |
TDOT-EXCAV GENERAL INSPECTION |
|
Approved |
finished up patch work - work completed - close permit |
| 11/30/2018 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
checked sidewalk and driveway everything looked good - they still have ac patching to do and i talked with them about squaring it all up - CN |
| 11/26/2018 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
looked at the forms for curb/driveway and sidewalk - will pour tomorrow - CN |
| 11/21/2018 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
went out and worked on driveway and sidewalk layout - i told them they could go up to 12% on the front approach to make other stuff work for the sidewalk - they plan to pour monday - called pete to let him know what i told them he was okay with it - CN |
| 11/19/2018 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
meet with mike about removing work that was done without a permit. |