Inspection Status: Approved
Inspection History: TDOT-EXCAV GENERAL INSPECTION
| Date |
Description |
Inspector |
Results |
Comments |
| 07/18/2018 |
TDOT-EXCAV GENERAL INSPECTION |
|
Approved |
matt said to close it out per his conversation with lance that its such a small area - close permit |
| 06/07/2018 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
pete and i went out and took pictures of the patch because the patch wasnt replaced as discussed on 5/3 yet a letter from dave with tricon sent to matt stated that it had been replaced 3 times. the patch is low and unreveling which is why i asked them to replace it on 5/3 |
| 05/03/2018 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
didnt see any change in the patch - left message for dave @ tricon - CN |
| 05/03/2018 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
meet with mike from tricon and showed him the issues with there patch - he didnt agree with me and was going to talk to dave his boss i will inform matt of whats going on- i also let pete know. CN |
| 04/18/2018 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
patch work and water valve installed higher then existing asphalt. contacted dave with tricon and asked him to get it fixed he said that he would fix it - CN |